Doctor and activist


Notice: Undefined index: hide_archive_titles in /home/chesterf/public_html/wp-content/themes/modern-business/includes/theme-functions.php on line 233

Category: Environment

Load-Based Pollution 24/12/16

Dr Ben Ewald from the Hunter, who has been working with Doctors for the Environment has been lobbying for a Federal EPA and wrote a submission on the load-based licensing system, which is another name for polluters paying a levy per tonne of pollutant that they produce.  There is some charge for each type of […]

Continue Reading

Contamination on 4 Corners tonight is just part of the tale 9/10/17.

Tonight’s 4 Corners is about the Royal Australian Air Force contaminating the groundwater around its bases with a fire fighting foam containing PFAS (Per- and Polyfluoro Alkyl Substances, aka Perfluorinated chemicals, PFCs).  It made me think of my experience with pollution. I started off in treatment medicine, and saw all the harm tobacco did, so […]

Continue Reading

Environmental Vandals using the COVID-19 Crisis to Get Dodgy Projects Up. 24/4/20

This perceptive article by Mike Seccombe in The Saturday Paper (11-17/4/20) details what disaster capitalists are doing to get mining under dams, fracking and revamps for coal-fired power up while Parliaments are closed and the world is distracted by the COVID epidemic. At the head of it all is the inimitable rorter, Angus Taylor, busy […]

Continue Reading

Farm Update: Bushfire Time Day 3, 2/1/20

The air is better today, with the wind from the north-east, so we spent the day on the roof cleaning out the gutters. 

It terrifies me especially climbing up the slope to do the dormer window gutters, which were the most full of tiny pine needles.  Zincalum (Colorbond) is much more slippery than the old galvanised iron was as you are reminded with every step.  I always resolve that ‘This is the last time I go on a roof’, but it seems resolutions are easier to make than to keep. There is always some circumstance. 

I had always suspected that gutter guards were more trouble than they are worth, but today proved it for me. There was a more material under the gutter guard than on top of it, and it made the gutters much harder to clean.  Jan was cross, and having had the gutter guard installed at great cost ripped it off to make it easier to clean next time.  The object was to have the gutters so clean that no ember can find sustenance there, but obviously a few days of wind before a fire will undermine our efforts.  Gutters are dangerous in that they do allow a point for fires to attack houses and my brother says that in Western Australia, gutters are illegal in fire-prone areas.  This is logical, but the gutters are needed to collect water, and fortunately we still have enough of that at present- it is very expensive to buy it by the tanker load.

I had not realised how much material is blown up under the corrugations of a roof. Even with a 35 degree slope there are quite a lot of pine needles under both the ridge cap and where the roofing iron meets the valleys.  It is hard to get out, so we banged the tin to dislodge them.  I am not sure if it is a way that fire gets into the roof space, but it seems logical to try to remove them.

So that is the rant about roofs. Tomorrow I have to teach Jan how to use the chain saw, as the dead tree is still not removed, and persuade her that the pergola needs a more severe pruning.  We are going to get a real fire pump, which John says manage a higher flow.  Proper fire pumps, give a large volume quickly, so you can turn them off and not waste water. The one we managed to fix yesterday just gives a modest even flow.  John was a Fire Education Officer before his accident and was just a little offended that I raced off to be briefed by the fire team that he used to work with, but I assured him that prophets are never recognised in their own homes, so he took it in good part.

Tomorrow will hopefully be a quiet day and I may return to Sydney. My son, Mike and nephew Nick will come down as the relief team as Saturday expects heat and southerly winds, so the danger will be on again.  The fire is still 35 km away, so hopefully it will still be OK.

Everything is relative.  As we were on the roof a couple drove in with a double horse float. Jan went down and spoke to them.  They run a resort with 14 horses.  Jan has two of theirs already and they had brought 2 more. He said that he had done a google risk analysis and said that we were the safest farm for horses in the Southern Highlands because of the amount of open space between the trees on the road and the house and stables.  He has National Parks on all sides of his resort, which is mainly native eucalypt forest and he has only one access road.  He brought food for his horses seeking asylum.  The Moss Vale showground will take horses, but is very crowded and the rule is that you have to stay with the animals, which of course mostly means abandoning your property.

Time will tell. It is likely to be a long summer.

Continue Reading

Libs Energy Scheme October 2017 Analysis 21/10/17

The Liberal/National Energy Plan is simply a lifeline to non-renewable energy that will keep electricity prices high.
It is getting praise from the Guardian, perhaps because it is a policy at all, and from Bloomberg , presumably because it is a solution that empowers retailers and gives a financial solution to a technical problems that leaves lots of fat for the key players, lots of bills for the consumer and slowed progress on climate change.
Why Have Prices Been so High?
The existing dysfunctional system is responsible for the current high prices due principally to:
1. The regulator permitted agencies to ‘gold plate’ the network of poles and wires so that electricity could be transmitted anywhere on the national grid. They were able to borrow money and build, which is what engineers like to do. The most likely trend with renewables was towards having more ‘embedded generation’ where electricity came from more diversified and smaller sources with fewer large power plants. So resource allocation to the network effectively favoured big existing generators and gobbled up the resources that could have been used for smaller more flexible generation. It also raised prices.
2. A National Electricity Market was created where bids were put in to supply power to the grid at 5 minute intervals, the assumption being that a market would drive prices down. In fact, vertically integrated big companies gamed the system, withholding power so that the price went up at key periods. The system was made ‘fair’ for that every suppliers was paid the latest (highest) price, and suppliers who had put in low bids earlier were not disadvantaged! The public and businesses consuming the power were gouged.
What is the New Scheme?
The new scheme mandates that electricity comes from a variety of sources, ‘reliable’ fossil fuel power, and renewables, which are assumed to be unreliable. The mix of sources changes over time, hence there can be a move to renewables as they as defined as more ‘reliable’. The scheme was devised by the existing companies, particularly the thermal players, which is probably why it has so few critics. But it will lock in the cost and pricing structures which are the cause of the problem.
The problem is that the government has confused reliability and despatchability (?deliberately). Reliability is measure of whether a power source will be working over a specified time period. Despatchability is whether power can be put into the system. Coal fired power is reliable as ‘base load’ in that it can have a relatively constant output. But it is slow to vary that output, so it cannot despatch power quickly in response to a fall elsewhere, and as such is not ‘reliable’ when needed to despatch a greater quantity quickly. Coal is much more expensive than renewables and the plants have to be kept going at a minimum of about 35% capacity to be able to increase, which does not happen quickly anyway. Keeping the coal plants as a ‘system spinning reserve’ effectively puts a base price on energy of about $85 per MWh, i.e. the typical wholesale price of power from a thermal plant. This makes this plan a government mandated, long term price fixing agreement.
Characteristics of Renewables
Renewable energy power systems and hydro have different characteristics. Hydro is despatchable if you have sufficient water. Australia’s lack of water means that all of our large hydro stations do not operate continuously. They are mainly used to handle short and medium length load peaks as they can respond quickly to load changes. Naturally if the water is pumped up when there is spare power they act as batteries. Hence the interest in ‘Pumped Hydro’, which just needs 2 reservoirs, one higher than the other.
Wind and Photo-Voltaic (PV) systems are not fully despatchable as their output is dependent on wind strength and sunlight. They can respond quickly to load changes. With a grid and a lot of different sites wind can be reasonably reliable overall.
A solar thermal plant uses a heliostat field of several hundred hectares of reflectors to concentrate sunlight onto a boiler mounted in a tower to heat a transfer medium, typically sodium carbonate to about 400 deg.C. The molten salt is pumped into a storage tank and then pumped through a heat exchanger to generate steam which drives a steam turbine. One such plant is planned for the head of Spencers Gulf in SA. Here the energy is stored as heat and the molten salt can be drawn from the hot tank to generate steam on demand i.e. the plant’s capacity is despatchable.
The availability of renewables in Australia is much better than the Liberals would have us believe and the ability to forecast wind in the medium term is now very good. Hence their availability is quite high.
Relative Costs
In terms of the economics, a wind farm costs about M$2.00 per MW to install. A 1MW unit running at 40% capacity factor, which is less than most wind sites can achieve, will generate about 3,500MWh pa at $85 per MWh this will be $300,000. Assuming capital costs of approximately $85,000 with service and maintenance of $84,000 this leaves a surplus of $207,000- a very good financial result especially when you compare this to a thermal plant which will cost about M$30 per MW to build and take 10 years in the building compared to about 3 years for a wind farm.
So what is the politics of this plan?
Because the electricity price will be set by the needs of the old fossil fuel plants the coal owners happy will be happy. It will also keep the renewable generators happy as the high price will give them a massive profit margin. It will keep Labor happy, as they can make a magnanimous gesture of bipartisanship in the short term and when they come in there will be lots of renewables built to get the huge profit levels that have been there for the taking.
The people who will not be happy will be the industries that will go broke because unnecessarily high power prices made them uncompetitive, and the long-suffering domestic consumers.
Alternatives
The alternative, a national bold move to all renewable power has been suggested by the research group, Beyond Zero Emissions (BZE). They have pointed out that Australia has a huge natural advantage in renewable energy because of this abundance of both solar and wind, but as the whole world moves to solar, we can only get the advantage of cheap power and the experience and equipment to export if we move quickly and decisively, which is exactly what we are not doing and what this expensive plan actively retards.
Need for Action
It seems that just as the US cannot go forward because of its gun lobby, Australia is in the same position with its coal industry. We need to demand action now, before this plan is implemented.
The South Australian Blackout
As a post script it is worth looking at the cause of the South Australian blackout. SA was getting about 40% of its electricity from wind, which had been very reliable. It was supplemented by two cables from the East, one of which was down for maintenance. The other source was a French-owned gas plant, which had a ‘pay whether you use it or not contract’ for natural gas. One of the gas exporters from SA had independently sold more gas than they could produce and were in a situation that they needed gas. As the wind was so reliable, the gas plant not generating but was taking gas it could not use and losing money. The solution for the gas plant was to sell the gas to the distressed exporter. Thus when the wind blew too hard, the link to the East blew over at the time the gas plant has no gas and the wind turbines had shut down as the wind was too strong. This was an unfortunate set of coincidences, but hardly a reason to return to coal. But it has been used to talk up unreliability of renewables and get this plan up. Politics!

Continue Reading

A Response to the Libs’ Energy Plan

19 October 2017

The energy plan proposed by the Lib/Nat government has several major flaws based on either their poor understanding of how an electrical network works or wilful misrepresentation.  It is a government sanctioned, long term price fixing agreement.

The current plan is to force energy retailers to buy a minimum amount of energy from “reliable” thermal plant to ensure reliability by reducing the input from “unreliable” renewables. The plan is not a surprise as the thermal plant owners had a big input into it. This effectively puts a base price on energy of about $85 per MWh i.e. the typical wholesale price of power from at thermal plant.

The government confuses reliability with despatchability.

Reliability is a measure of whether a power source will be working over some specified time interval.  A better metric is availability i.e. the time period over which the power source is performing within acceptable parameters.

Modern well maintained thermal power stations have availabilities in excess of 95%.  But for example if Liddell which has 4×500 MW turbo generators has only been able to keep 3 running consistently its total availability would be 95%x0.75 =70% i.e for 70% of the time over the last few years it has been able to despatch, supply when needed 4×500 MW. Its capacity to despatch 3 x500MW has been 95%. Actually Liddell’s performance has been much worse than this.

Base load is the Coalition’s other favourite subject. It takes about 8 hours to start up a large thermal power station and about 12 hours till it comes up to full capacity. These times are dictated by differential expansion of its components. Hence normal practice is to keep these units running continuously. They also exhibit stability problems when run at less than 30% capacity. At night when the demand for electrical energy drops, continuously running operations like steel mills, aluminium refineries, cement works etc. took up this load generally this was not enough to keep the load above 30% hence the low off peak rates offered for water heating.

The problems of differential expansion also mean that thermal plant cannot respond quickly to changes in load especially load increases.

The above limitations meant that in a system dominated by thermal plant you have to keep enough older plant running at low load so that it could take up the power of the largest unit in your system should that unit be forced to shut down in an emergency i.e. trip. This is system spinning reserve.  So the price will be set by the needs of the old fossil fuel plants. This will keep the coal owners happy. It will also keep the renewable generators happy as the high price will give them a massive profit margin. It will keep Labor happy, as thye can make a magnanimous gesture of bipartisanship and when they come in there will be lots of renewables built to get the huge profit levels that have been there for the taking. 

The people who will not be happy will be the industries that will go broke because unnecessarily high power prices made them uncompetitive, and the long-suffering homeowner.

Renewable energy power systems and hydro have different characteristics. Hydro is despatchable if you have sufficient water. Australia’s lack of water means that all of our large hydro stations do not operate continuously. They are mainly used to handle short and medium length load peaks as they can respond quickly to load changes. Naturally if the water were pumped up when there was spare power they would act as batteries.

Wind and PV systems are not fully despatchable as their output is dependent on wind strength and sunlight.  They can respond quickly to load changes.

Their availability here in Australia is much, much better than the Liberals would have us believe and our ability to forecast wind in the medium term is now very good.  Hence their availability is quite high.  We can also use concentrated solar thermal plant. Here a heliostat field of several hundred hectares is used to concentrate sunlight onto a boiler mounted in a tower to heat a transfer medium, typically sodium carbonate to about 400 deg.C. The molten salt is pumped into a storage tank and then pumped through a heat exchanger to generate steam which drives a steam turbine. One such plant is planned for the head of Spencers Gulf in SA. Here the energy is stored as heat and the molten salt can be drawn from the hot tank to generate steam on demand i.e. the plant’s capacity is despatchable.

For example a wind farm costs about M$2.00 per MW to install. A 1MW unit running at 40% capacity factor, most wind sites do better, will then generate about 3,500MWh pa at $85 per MWh this will be $300,000. Assuming capital costs of say $85,000 and service and maintenance of $84,000 this leaves a surplus of $207,000 a very good financial result especially when you compare this to a thermal plant which will cost about M$30 per MW to build and take 10 years in the building compared to about 3 years for a wind farm.

Older thermal stations like Liddell are worn out especially their boilers which from a large part of the capital cost the boiler tubes suffer from stress fatigue and start developing fractures. Coal and ash handling plant starts to wear out and even the turbine blades erode due to the aggressive operating temperatures. Eventually the combination of wear and loss of availability makes them uneconomic. Try keeping a 40 year old car road worthy if you use it as a taxi.

Continue Reading

Energy Plan- why it is bad, and why there is not much protest.

19 October 2017

No one quite understands the new energy policy, (National Energy Guarantee -NEG) which is why there is not much protest. But I suspect it is very silly. Here is why.

The National Electricity Market worked because suppliers put in bids for a price on 5min supplies. But big producers could withhold creating a shortage, then put in a late bid at a high price. That segment would then go out at that highest price with every supplier getting the higher price. Logically then,the cheaper producers simply made more money. I have heard that a wind turbine in a good location could be paid off in 18 months, and that the price will settle at about $87 a megawatt hr.

The new plan puts big stress on reliability, so the solar and wind people are disadvantaged, but can still make a lot of money. The coal technology is still not much use, as they cannot compete with renewables when the sun shines and the wind blows, and they cannot ramp up supply quickly. They are, as everyone keeps saying, better for base (=constant) load. Added to this they are obsolete as the pipes in the boilers get stress fractures after a certain time and maintenance becomes uneconomic.

Gas is good at turning on and off quickly, but as we know, gas contracts for export has left us short, so Malcolm will create some problems there.

So a system that has been rorted by a few inside players who get supernormal profits will be given a licence to continue. The price of electricity will not fall much, and the consumer will continue to be gouged, with vulnerable industries simply going broke to allow the energy players to get profits that they really should not have. But there is not much protest because either people do not understand what is happening, or they are beneficiaries of a little understood rort that will continue because they have cleverly used fear of blackouts to get a cushy system.

And I suspect Labor will support it, as it has support from the energy industry, and they can claim bipartisanship, and they have been too lazy to get a better plan.

See also the Post ‘A Response to the Libs’ Energy Plan 19/10/17′

www.abc.net.au/news/2017-10-17/explainer-energy-policy-what-is-the-coalitions-new-plan/9057158

Continue Reading

Doctors for the Environment Recommend Load-Based Licencing for Polluters 27/12/16.

Today I reconnected with Dr Ben Ewald from the Hunter, who has been working with Doctors for the Environment.  He has been lobbying for a Federal EPA and wrote a submission on the load-based licensing system, which is another name for polluters paying a levy per tonne of pollutant that they produce.  There is some charge for each type of pollutant, and the charge can also be loaded for how close the pollutant is to population centres, as this relates to its health impacts. NSW has had such a scheme for years, which is fact the best developed in Australia, but NSW keeps the rate of this tax very low otherwise NSW would merely end up importing electricity from other states that pollute more but had no such tax. Hence the need for a national system. The current NSW fee is only 0.82% of the sale price per megawatt. 

Other facts were that there is 1.1 million tonnes a year of Sulphur dioxide produced in Australia, 51% from coal-fired power stations. They also produce 380,000 tonnes of Nitrous oxides, 52% of all produced annually in Australia.  Coal-fired power stations produce 8,900 tonnes of PM2.5, which is however only 29% of the national output of PM2.5, which is 31,000 tonnes.  PM2.5 is particles of 2.5 microns in diameter, which are the smallest ones measured.  There used to be a lot of emphasis on how much pollution in the air by how much weight of pollutant there was per cubic metre of air.  Then researchers realised that big particles get caught in the nose, whereas small particles continue down into the lungs and have bigger health effects. So the absolute weight of particles is not as important as the number of smaller particles. Hence the new interest in PM2.5!

It also turns out that while the coal-fired power stations are the ones with the load-based licences, the open cut mines produce the most carbon particle pollution but are exempt from fees!  That is a political decision of course.    Doctors for the Environment need to be supported as they beaver away producing the submissions and organising the facts that the governments need to be told and that the activists need to amplify!  Here is the submission:

http://dea.org.au/images/uploads/submissions/NSW_-_Review_of_the_load-based_licensing_scheme_submission_12-16.pdf

Continue Reading